R.W. Dirks Petroleum Engineering, Inc.
2007 Activity Report
Total Wells Drilled: 96
Total Feet Drilled: 639,919
Average Feet Drilled: 6,655
Total Wells Completed: 130
Total Wells Depth Completed: 917,937
Average Well Depth Completed: 7,061
Total Tank Batteries Built: 28 |