| R. W. Dirks Petroleum Engineering, Inc. | ||
| 2006 Activity Report | ||
| Total Wells Drilled: | 91 | |
| Total Feet Drilled | 595,171 | |
| Average Feet Drilled: | 6,540 | |
| Total Wells Completed: | 185 | |
| Total Well Depth Completed: | 1,299,378 | |
| Average Well Depth Completed: | 7,024 | |
| Total Tank Batteries Built: | 41 | |